Second Stakeholder Meeting

December 2024

On the 3rd of December, the XL-Connect project hosted its second Stakeholder Meeting with its esteemed Stakeholder Board. The focus of this meeting was on the planned and ongoing demonstrations in the project. The leader of Work Package 5 (virtual and real demonstrations) – Lorenzo Berzi from the Univeristy of Florence – presented the current status and the planned activities for the project’s demonstrations. The themes that were discussed included:

  • The Virtual Demonstration in Aachen, Germany
  • Grid stability and Equipment Testing
  • Virtual Powerplant and Aggregation
  • Testing Infrastructure and Future Vehicle Compatibility

The members of the Stakeholder Board are:

  • Gerd Bumiller (Ing. Büro Dr Ing Gerd Bumiller)
  • Stephan Hell (KOSTAL)
  • Christoph Schernus (FEV, EARPA, 2ZERO)
  • Reinhard Pannold (Energy informatics consultant)

We would like to thank our Stakeholder Board for partaking in the interesting discussion and providing us with valuable feedback!

 


Project progress
Coordination

© 2023 XL-CONNECT

Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union. Neither the European Union nor the granting authority can be held responsible for them.

EN-Funded-by-the-EU-NEG (1)